New construction · Toronto & GTA
Plumbing for new custom homes in Toronto & the GTA
From the first trench to the final inspection. We plumb new custom homes and knock-down rebuilds for builders and for owners building their own house.
Services
What plumbing does a new house need?
Every new home goes through the same stages. We handle all of them with one crew lead.
Underground plumbing
Building drain, sewer connection, sump pit and backwater protection below the slab.
Learn more →Rough-in plumbing
Drain, waste and vent piping plus PEX or copper supply lines inside the framing.
Learn more →Finish plumbing
Fixtures, faucets, toilets, water heater or boiler hook-up and final inspection.
Learn more →Water service installation
New or upsized water line from the property line to the house, sized for the whole home.
Learn more →Radiant floor heating
Hydronic in-floor heating with a boiler or combi unit, designed with the plumbing.
Learn more →Basement apartment plumbing
Rough-in for a secondary suite while the walls are open, when it costs the least.
Learn more →Builder program
Stage pricing, 48-hour quotes from drawings and one crew lead from underground to final.
Learn more →Why builders use us
How do we keep your build on schedule?
Plumbing sits on the critical path three times: before the slab, before drywall and before closing. We plan around all three.
- Fixed quote from drawings in 48 hours, split by stage so draws line up with your schedule.
- One crew lead from underground to final, not a new face at every stage.
- Inspections booked by us with the municipality at every stage.
- Licensed plumbers, WSIB and liability insurance documents on request.
- Photo record of every stage before it is covered.
Send the drawings
Architectural and mechanical drawings are enough to quote. You get a fixed price per stage within 48 hours.
Send drawingsFAQ
Common questions
How much does plumbing cost for a new custom home?
It depends on the number of bathrooms and fixtures, the water service size, the heating system and extras such as recirculation or water treatment. Send the drawings and we return a fixed quote within 48 hours.
What are the stages of new home plumbing?
Underground (drains and sewer connection below the slab), rough-in (piping inside the framing, tested before drywall) and finish (fixtures, hook-ups and final inspection). Each stage is inspected.
Do you work with homeowners building their own house?
Yes. We work with builders and with owners who are managing their own build.
Which areas do you cover?
Toronto, Etobicoke, North York, Scarborough, Mississauga, Vaughan, Brampton, Richmond Hill and the rest of the GTA.
Building a new home?
Send the drawings. Fixed plumbing quote, split by stage, within 48 hours.